BVEStation

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - trainbrain

Pages: 1 [2] 3 4 5 ... 8
16
Cant wait for the 6! Will it include the 6 express and 6 local?

They are developing the <6> scenario as well as the (6) IIRC.

17
Great job with this Lashrathorus. Can't wait to drive this route!

18
Keep up the good work guys..can't wait for more IRT.

19
Content Development / Re: Updating the old (L) for BVE
« on: June 02, 2013, 03:13:34 pm »
I am restarting work. Expect a fully detailed Myrtle Ave coming soon.

I am obtaining shots for 8th Ave.
Like it?

20
I know that at some point someone was making a Northeast Corridor route, but I don't know what happened to that.

Perhaps we can revive these to go w/ the plugin.

http://forums.bvestation.com/index.php?topic=256.0

http://forums.bvestation.com/index.php?topic=1299.msg16125#msg16125

21
Wow Mudwrestle, this is amazing.
Going back to page 1 of this thread and then to here seems like going to a whole other planet! How this train has changed overtime really shows what developers are capable of.

22
Wow...this is really nice.
And about the timer in the video that never clears, the 2-shot GT 1st shot and 2nd shot must be placed 40 meters apart to work right.

23
Photography / Re: GM New Looks, anyone?
« on: May 31, 2013, 06:54:29 am »
Those are nice buses, wish they still ran here in NY.

24
NYCTA Projects / Re: JFK Express: Official development thread
« on: May 29, 2013, 04:41:49 pm »
For you to make this, you're going to need a hell of a lot of experience coding and a lot of time. Now i'm not doubting you, but i can't even create a route like this (i would have made one if i could).  You would basically have to merge the new Q via 6 av Scenario(will be released with Q v8), run it local after W4 (on the F) , code all the way to jay street from w4 (knowing the correct distances and signaling), and then merge it with the A line file to Howard beach.

I have to merge the (Q) with the (C) at West 4, which involves coding AB1 track, the connection between 6th and 8th. Then I switch to the (A) at Jay and use that track to Howard Beach-JFK.

The updated (A) and (C) lines are in development, it may help to wait for those to get the textures.

Who is developing those routes? Maybe they have textures and I will PM them. I got the Bway Junction textures last weekend, as I was forced to go there because the (L) was shut down.
________________________________________________________________________________________________________________
Also, since the JFK Express used R46s before GOH, perhaps we can update the R46 to make it a pre-GOH model and give it THIS look. I know error46146 said something about this in early Spring when the Bicentennial R46 was released.







Just a thought.


25
Off Topic / Re: 8/6th AV Local/Express
« on: May 29, 2013, 04:26:58 pm »
Hey BVE community,have you ever wondered why the A and D were express lines and the B and C are local?




WELL HERE'S A POSSIBILITY:


The A and D represent Christ's death A.D.(after death)


The B and C represent B.C.(before Christ)

A.D. doesn't stand for after death, it stands for Anno Domini meaning "modern years" in Latin.

26
NYCTA Projects / Re: JFK Express: Official development thread
« on: May 29, 2013, 12:39:29 pm »
For you to make this, you're going to need a hell of a lot of experience coding and a lot of time. Now i'm not doubting you, but i can't even create a route like this (i would have made one if i could).  You would basically have to merge the new Q via 6 av Scenario(will be released with Q v8), run it local after W4 (on the F) , code all the way to jay street from w4 (knowing the correct distances and signaling), and then merge it with the A line file to Howard beach.

Yea I know, that was my plan. (here goes nothing) lol

27
Oh well, no matter, this route looks nice enough as is. Can't wait for the release.

28
I like the idea. Is there  going to an Amtrak, LIRR or MNR routes and activites to go along with the signaling. I would love to see what everyone can come up with... SHould be pretty interesting .

I know that at some point someone was making a Northeast Corridor route, but I don't know what happened to that.

29
Sounds like a great idea, I would love to help if you need it.

(textures, helping to equip trains, etc.)

30
I actually removed the signal plates because it would take months to accurately create every single Signal plate for Broadway, 6th Av, West End, 4th Av, Sea Beach and Brighton and then put them all into signals.

Oh ok just thought it maight be cool cause of how BVE 2 told you the signal name and upcoming aspect, maybe we could use that data to make signal plates, then this would be the ultimate route in terms of accuracy.

Pages: 1 [2] 3 4 5 ... 8