BVEStation Forums
BVE => General BVE/OpenBVE => Topic started by: PSharp217 on May 18, 2013, 09:58:20 pm
-
As stated in the previous, here are my routes and directions that are already download to the Station.
1. G Line with 4 Car OPTO
1. 71 Street / Continental Ave to Church Avenue
2. Church Avenue to 71 Street / Continental Ave
3. Church Avenue to Court Square
Station Environment and Signals System Upgrade w/ live trippers.
2. Southbound Q SMEE / NTT from Coney Island to 57 Street / 7 Avenue
1. Local via R Line
2. Local Brighton / Express Manhattan
Station Environment and Signals System Upgrade w/ live trippers.
3. Northbound / Southbound N / R
1. via Bridge
2. Via Tunnel
FastTrack Activities, Live Construction Flagging, Holding Lights, Breakdowns, Radio Communication and Real Yard Storage (From Lead to Destination), Signal Malfunctions would be a great integration.
-
all of those are being worked on
perhaps if you want them to be done, why not code them in yourself
-
ok cool.. I just need to get the tutorials and will make a valiant effort to help out in anyway I can.
-
As stated in the previous, here are my routes and directions that are already download to the Station.
1. G Line with 4 Car OPTO
1. 71 Street / Continental Ave to Church Avenue
2. Church Avenue to 71 Street / Continental Ave
3. Church Avenue to Court Square
Station Environment and Signals System Upgrade w/ live trippers.
2. Southbound Q SMEE / NTT from Coney Island to 57 Street / 7 Avenue
1. Local via R Line
2. Local Brighton / Express Manhattan
Station Environment and Signals System Upgrade w/ live trippers.
3. Northbound / Southbound N / R
1. via Bridge
2. Via Tunnel
FastTrack Activities, Live Construction Flagging, Holding Lights, Breakdowns, Radio Communication and Real Yard Storage (From Lead to Destination), Signal Malfunctions would be a great integration.
All 3 of those are already being worked on. I was going to update the G with everything new as i wanted to have a via crosstown scenerio on F v5. The Southbound N is already being worked on by JayJay85 and Me, along with the northbound N. The North bound R is also nearly complete, just needs updates on its textures. Like i said, i'm putting a lot of work into the Southbound Q, and the reason i don't want to work on a Brighton local for v8 release is because of the amount of work i or jayjay85 would have to do in Version 9, in which i would be upgrading the entire brighton line with realistic buildings. If a brighton local is created now, then jayjay85 or I would have to do double the work on getting the train to run local in v9 with the updated brighton portion.
-
Would you rather have updates or all of the routes being done? It's sensible to wait until all of the routes are completed, then go on with updates
-
patience is golden and well worth the wait... So I'll wait and continue to applaud your good work............I didn't know that those were already in the works... I appreciate the feedback.... thanks.