1
BVEStation Network News / Re: Making All Stops : Volume One
« on: July 31, 2012, 09:27:44 pm »
oh this is a good idea lol.
This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.
Oh yeah, all of the new C40LF's have cameras so they have this wireless for that purpose.it is on the buses for the depots to check the cameras on the c40smost of the buses front white camera is for the driving camera and the ones in the bus is for watching the passengers that's one reasons for the locked WiFi another is for maintenance.
I noticed that there was only 1 camera and that was like the one the +SBS has to make sure no one is blocking the bus lanes
fine with me.The middle track is for express service only, stopping at 36th, 9th Ave, 62nd St Bay Parkway and StillwellI'll be doing the Local part first, exp will be done later
lol that sucks better get that fixed.Jup your announcements are delayed due to the fact that my PC is acting really weird to the point I have lost access to 4shared, RouteViewer and openBVE.sounds like you have malware buddy
dont worry about it take your time.If I have enough time and resources then sureoh so how about after you get done with everything.hey rayvon nice previews of the 110A but who will do the 110B?As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now
oh so how about after you get done with everything.hey rayvon nice previews of the 110A but who will do the 110B?As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now
Please check the Downloads section. You will find how to intsall openBVE, and with the new enhancements they have made its easy to install.what about the 4?
Thanks to Pacific385 this route will have animated trainsets that move. There will be two versions.
The (5) will have animated trains moving in the opposite direction.
The (6) will have animated trains moving in the same direction.
The projected date for the completion of the (5) and (6) line will be March 5, which is a Sunday.
I would like to thank the following for contributions and support on the route.
tvega961
BStyles
Lexington456
Bebo
ARome
Pegasusleos4
Kyz101
AlanR160
Jupdaddy
Pacific385
MrRailfan
D train fan
Joseto
No it will not.oh ok well it was just an idea.
Ok, so there were 2 replies, so I wrote 1 and 2 on different cards, and I randomly selected any card 14 times. Result:i got the pm and thanks for the voucher.
1,1, 1, 1, 1, 2, 1, 2, 2, 2, 2, 2, 2, 2
Times number 1 was picked: 6
Times number 2 was picked: 8
So since B41 was the second one to reply, and the number two was selected more times, B41 wins and will receive the voucher. If I get any more vouchers I will continue to give them away. B41 your voucher code is on your PM