BVEStation Forums
BVE => Other Projects => Topic started by: SimCentral on May 30, 2015, 01:48:43 pm
-
;DIve created the skeleton of the sirr from st george to old town
https://youtu.be/QK2tgV4JMpE
https://youtu.be/QQw5l2BIQyA
-
update
https://youtu.be/PYnHow11eHg
-
THe rout is almost complete. Right now its complete until prince's bay.
-
Now all we need is a SIR R44.
-
@OIG119
I know they were working on a SIR version of the R44 along with the regular version, we haven't got any new updates on it, But last thing we heard was it was making good progress :)
@simcentral
The route is coming along great :) i just rode the SIR for the first time this week. When your finished it will be a great route, especially since it has a little of everything (elevated, open cut, level running)
-
@ramirez
Thanks The route is complete to tottenville so expect a beta release soon
-
Looking forward to it :)
-
When is the R44 train coming out? I can't wait for the SIR R44.
-
When is the R44 train coming out? I can't wait for the SIR R44.
im working on it. The panel is all that is left.
-
im working on it. The panel is all that is left.
Great! About how long until it is finished?
-
What did I JUST tell you in the other forum. Some people never learn SMH.
-
were not sure when things will be released. We have lives outside of developing and cant spend all are lives developing. it will be released when its completed and fully tested. It can be as close as a month and as far as a year
-
Great! About how long until it is finished?
The cabin itslef is finished for the mainline and a conversion to SIRR shouldn't take too long, however the throttle needs to be animated and that proved to be a much tougher project then originally anticipated and since i currently have my hands full with the Q line, expect the 44 to be out shortly after the Q is out. No time frame on that but it should hopefully be out withing the next 1 or 2 months.
-
Awesome Job Mr. Railfan, keep workin to make that thing awesome! =)
-
The cabin itslef is finished for the mainline and a conversion to SIRR shouldn't take too long, however the throttle needs to be animated and that proved to be a much tougher project then originally anticipated and since i currently have my hands full with the Q line, expect the 44 to be out shortly after the Q is out. No time frame on that but it should hopefully be out withing the next 1 or 2 months.
Thanks, Mr Railfan. At least someone just gives me the answer I wanted to know.
-
After the (3) line is complete the SIR will be redone halting the release