106
NYCTA Projects / Re: (WIP) Official Development Thread for the A from Lefferts to 207th
« on: February 19, 2015, 11:34:23 pm »
Over Mid-Winter Break, catwalks have been modified on the switches to "mesh" with existing objects. I am in progress of coding rockaway switches as one big file instead of using multiple files within the folder and multiple codes within the route file. The route is approximately 40% done (excluding Euclid and Grant). The basic skeleton is done up to 80th Street, with grades and curves. When I have the time, I will post screenshots.