BVEStation

Author Topic: The R110A  (Read 20608 times)

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #15 on: February 01, 2011, 06:37:11 pm »
so are you gonna animate the controller
most likely in a future release. I have a controller ready, but I don't have the time needed to properly place it in.
« Last Edit: February 01, 2011, 09:10:38 pm by Rayvon »

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #16 on: February 07, 2011, 08:01:47 pm »
A vid of what's been done so far. The Motor is almost finished (and you can see a tiny bit of the panel):
OpenBVE R110A preview

Offline Bombardier01800

  • Head Admin
  • Dispatcher
  • ******
  • Posts: 749
  • Gender: Male
  • Apple Certified Macintosh Technician
    • View Profile
    • MBTA and NJT Transit Forums
Re: The R110A
« Reply #17 on: February 07, 2011, 09:50:46 pm »
I like it, but the very beginning sounds too low, or maybe a different train... The rest is perfect
Jose
BVEStation Administrator

Offline Simon

  • Conductor
  • **
  • Posts: 223
  • Gender: Male
  • BVEStation Member / Community Critic
    • View Profile
Re: The R110A
« Reply #18 on: February 07, 2011, 10:10:58 pm »
The train sounds great rayv! By the way, was there a point sound? Didn't seem like there was one when it was running over those tracks at Nevins.
Kawasaki_Plant

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #19 on: February 07, 2011, 10:48:38 pm »
The train sounds great rayv! By the way, was there a point sound? Didn't seem like there was one when it was running over those tracks at Nevins.
Thanks, and nope, I haven't added it in yet. There's still a couple of sounds left to add.

And the startup motor sound is the last one I need to fix, it's from the sounds I already have but at an extremely low pitch

Offline Bombardier01800

  • Head Admin
  • Dispatcher
  • ******
  • Posts: 749
  • Gender: Male
  • Apple Certified Macintosh Technician
    • View Profile
    • MBTA and NJT Transit Forums
Re: The R110A
« Reply #20 on: February 08, 2011, 07:08:47 pm »
The train sounds great rayv! By the way, was there a point sound? Didn't seem like there was one when it was running over those tracks at Nevins.
Thanks, and nope, I haven't added it in yet. There's still a couple of sounds left to add.

And the startup motor sound is the last one I need to fix, it's from the sounds I already have but at an extremely low pitch
Alright man cool stuff...
Jose
BVEStation Administrator

Offline B41

  • New Recruit
  • *
  • Posts: 36
  • Gender: Male
  • BVEStation Member
    • View Profile
Re: The R110A
« Reply #21 on: February 25, 2011, 09:25:23 pm »
hey rayvon nice previews of the 110A but who will do the 110B?

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #22 on: February 26, 2011, 06:00:06 pm »
hey rayvon nice previews of the 110A but who will do the 110B?
As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now

Offline Bombardier01800

  • Head Admin
  • Dispatcher
  • ******
  • Posts: 749
  • Gender: Male
  • Apple Certified Macintosh Technician
    • View Profile
    • MBTA and NJT Transit Forums
Re: The R110A
« Reply #23 on: February 26, 2011, 06:39:13 pm »
Ray, I can get you textures of a handle similar to the R110A's... Let me know if you want me to
Jose
BVEStation Administrator

Offline B41

  • New Recruit
  • *
  • Posts: 36
  • Gender: Male
  • BVEStation Member
    • View Profile
Re: The R110A
« Reply #24 on: March 04, 2011, 09:33:34 pm »
hey rayvon nice previews of the 110A but who will do the 110B?
As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now
oh so how about after you get done with everything.

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #25 on: March 04, 2011, 10:54:40 pm »
hey rayvon nice previews of the 110A but who will do the 110B?
As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now
oh so how about after you get done with everything.
If I have enough time and resources then sure

Offline B41

  • New Recruit
  • *
  • Posts: 36
  • Gender: Male
  • BVEStation Member
    • View Profile
Re: The R110A
« Reply #26 on: March 06, 2011, 01:04:50 am »
hey rayvon nice previews of the 110A but who will do the 110B?
As of right now I don't think anyone is planning to. I only have 1 B division project in the works and the rest is A division for now
oh so how about after you get done with everything.
If I have enough time and resources then sure
dont worry about it take your time.

Offline pitor160

  • Operator
  • ***
  • Posts: 321
  • Gender: Male
  • BVEStation Contibutor
    • View Profile
Re: The R110A
« Reply #27 on: March 15, 2011, 04:17:28 pm »
r u gonna make the r110B

Offline Rayvon

  • Operator
  • ***
  • Posts: 384
  • Gender: Male
  • BVEStation Administrator
    • View Profile
Re: The R110A
« Reply #28 on: March 15, 2011, 05:51:07 pm »
If I have enough time and resources then sure