BVEStation

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - BStyles

Pages: 1 2 [3] 4 5 6 ... 21
31
Good to know my trippers are still alive. The don't work just yet with tripping trains, but with a little more tweaking, it should stop all of the speed racers during runs.

Anywho, back to the Manhattan Bridge:


Did some retexturing and finished the lower level roadway:


Sending this along to the developers shortly. Should go well with the recent updates.

BStyles

32
YO can't wait!!! I hate to beat a dead cow, but is the R62 Dead Bstyles?

No I just haven't worked on it while working on Eastern Parkway. Still going strong in the background, and we'll post updates once I consolidate some more topics.

you guys gonna model the trailer trucks as well?

I know what you're talking about, actually, and I have some textures of it. Once I get them sorted I'll make another version.

BStyles


33
Hopefully this is the last time I'll have to update Utica Avenue.



BStyles

34
Continued development has been moved to this thread: http://forums.bvestation.com/index.php?topic=2545.0

BStyles

35
Continued development has been moved to this thread: http://forums.bvestation.com/index.php?topic=2545.0

BStyles

36
Continued development has been moved to this thread: http://forums.bvestation.com/index.php?topic=2545.0

BStyles

37
We're gonna start consolidating these topics into one, this way they stay at the top of the page and you don't have to go looking for the progress. This is the topic for the new tech trains, currently being worked on by myself, Mr. Railfan, DJ Hammers, Nyctrman, Manny, XD60, and the rest of the team.

BStyles

38
Trackside wall at Bergen.

The 2, 3, 4, and 5 are following development so closely that every route along Eastern Parkway shares the same meter mark, just as it does in real life.  More updates to come shortly.

BStyles

39
Some more eye candy, on my part. Remember this?


Well, take a look at it now.


BStyles

40
Making the NEC in bits and pieces makes absolutely no sense in the long run, considering that most of the routes don't make short stops (In between, you have auxiliary routes like MARC and NJ Transit).  The Acela Express is a single shot, and the AEM-7 and HHP-8 consists go as far as Miami.

BStyles

41
Well that is not entirely true...there are pretty long British routes similar to the NEC, namely the Tyne Valley and ECML Northumberland routes.

Yes but those aren't 400 miles long.

BStyles

42
Rstar and I are working on a supplement for those trucks, if you would like to wait a bit longer to release. The new ones will be the actual trucks meant for this train.

BStyles

43
A lightbulb is a lightbulb. That is a really small and unnecessary move, considering the bigger picture of things, which is the overall development of the line. Great job on the R so far, Lash.

BStyles

44
NYCTA Projects / Re: 7 Update
« on: June 01, 2013, 05:16:22 pm »
Updates on the 7 and the rest of the Times Square-bound line will continue in a more consolidated topic to keep updates fluent, here: http://forums.bvestation.com/index.php?topic=81.0

Topic locked.

BStyles

45
NYCTA Projects / Re: NYCT 1 line
« on: June 01, 2013, 05:15:02 pm »
Updates on the 1 and the rest of the South Ferry-bound line will continue in a more consolidated topic to keep updates fluent, here: http://forums.bvestation.com/index.php?topic=81.0

Topic locked.

BStyles

Pages: 1 2 [3] 4 5 6 ... 21